joeyww12000
Senior Member
- Location
- Chatsworth GA
I need some clarification on when to fully size grounding electrode conductors. Im bonding together building steel, concrete incased electrode, water pipe and a groundrod. First off Im coming in after someone to finish this and the way the pipes are ran is a small challenge since some wire has been pulled already. You have a 600a disconnect outside where they connected the grounded conductor to the can via bonding screw and out to a groundrod and a concrete encased electrode with a 2/0 cu. From the disconnect to the MDP no grounding conductor is pulled, only 3 phase conductors and a grounded conductor. I need to bond my steel and waterpipe inside the building. What size grounding conductor do I need to get from the grounded and grounding conductor bonding point inside the disconnect inside the building to the steel and water pipe?