Transportation Guy
Senior Member
- Location
- Williamsburg,VA
We have a church we inherited from an unlicensed contractor. Cleaning up a huge mess. We have 3 service disconnects (200 amp) fed by 1 utility company transformer. (1 meter) Coming out of the transformer are 3-2" pipes and per plan we installed 4-3/0 cables. 3 hots and a neutral. I was planning on installing 1#4 bare copper per panel based on 250.66 but realize now that's not correct based on note 1. Please help.
Sent from my iPhone using Tapatalk