The Iceman
Senior Member
- Location
- Florida
I just finished Mike Holt's video, Grounding versus Bonding, for the second time. I'm still not sure about the 12 1/2% rule. If I'm sizing the GEC for a metal water pipe, or the grounded neutral conductor from the service to the meter enclosure, and I'm over 1100 Kcmil copper, how does the 12 1/2% rule work? Actually table 250.66 has over 1100Kcmil. Now I'm really confused. When do I use the 12 1/2% rule? And how does it work?