For an Information Technology Equipment room, can a UPS system be sized based on actual load rather than nameplate?
Also, NEC article 645.5(A) refers to "connected load" for the branch-circuit conductors, is this refering to actual load or nameplate?
Thanks, John
Also, NEC article 645.5(A) refers to "connected load" for the branch-circuit conductors, is this refering to actual load or nameplate?