Jpmigas
New User
- Location
- Buffalo,NY USA
200 amp 240/120 residential service with 2 meter sockets. 100 amps for a house and taking 100amps from the other meter to a 100 amp disconnect to a pole barn 300 feet underground in PVC schedule 40 conduit. I figured I need # 1 copper thhn or #2/0 aluminum to accommodate voltage drop so as not to exceed 5% drop. Is that right?