Hi All -
I need a little help here. I'm working on a project where there is a need to bring many runs of SO type cable back to the panel. Each branch circuit is run on SO cable.
I've never had to do a set up like this exactly. So, my question is about the best way to strain relief these so cables coming into the box. The panel is a 42 space eaton panel. There will be some 30odd circuits each 120v 30a. Cable entrance will be from below. While at first I might be inclined to strain relief in the same way I do anything else, the issue that comes to mind is the larger size/diameter of the SO and if it's even possible to punch this many into a panel physically. It would seem that if I could I'd, at least, be making suiss cheese out of the panel bottom.
So, before doing anything, I solicit for any opinions or suggestions on this matter.... What do you guys think?
The IT team suggesting popping a grommet in the bottom (not strain relief) to feed one or more bundles out of the panel and then strain relief immediately below with a lacing bar similarly to how data cabling is done. Never done that with electrical. Anyone have thoughts there?
These cables will ultimately land in an open wire way / basket that distributes them to the various loads.
Your consideration is most appreciated!
-J
I need a little help here. I'm working on a project where there is a need to bring many runs of SO type cable back to the panel. Each branch circuit is run on SO cable.
I've never had to do a set up like this exactly. So, my question is about the best way to strain relief these so cables coming into the box. The panel is a 42 space eaton panel. There will be some 30odd circuits each 120v 30a. Cable entrance will be from below. While at first I might be inclined to strain relief in the same way I do anything else, the issue that comes to mind is the larger size/diameter of the SO and if it's even possible to punch this many into a panel physically. It would seem that if I could I'd, at least, be making suiss cheese out of the panel bottom.
So, before doing anything, I solicit for any opinions or suggestions on this matter.... What do you guys think?
The IT team suggesting popping a grommet in the bottom (not strain relief) to feed one or more bundles out of the panel and then strain relief immediately below with a lacing bar similarly to how data cabling is done. Never done that with electrical. Anyone have thoughts there?
These cables will ultimately land in an open wire way / basket that distributes them to the various loads.
Your consideration is most appreciated!
-J