solar power system disconnect location

Status
Not open for further replies.

winslowfam

Senior Member
Location
VA
Our client is installing a solar power system and connecting it to his main panel. I had heard that the code requires that the solar power system disconnect be physically located near the plant power system metering point so that both sources of power can be disconnected easily during an emergency at the plant. I cannot find this requirement in the code article 690. 690 only says that the disconnect must be readily accessible, that I can find. Any ideas of if I am reading this right? Thanks.
 
Status
Not open for further replies.
Top