I've been taught that for new construction projects there is a code requirement for having spare capacity. For example, for a 100A service for a new construction project with only one panel, I can only load the panel up to 80A. What code section is this indicated in?
Also, if the panel is a 42 pole panel. Can I load install equipment on all 42 poles or is there a code requirement that for new construction there needs to be spare physical space within the panel too?
Also, if the panel is a 42 pole panel. Can I load install equipment on all 42 poles or is there a code requirement that for new construction there needs to be spare physical space within the panel too?