N nivekbro Member Location Florida Occupation Electrician Dec 31, 2024 #1 Good night Mike Holt when comes to SPD requirement. If you have a 320 continuous meter with double lugs feeding two separate mains how many SPD are required to be installed.
Good night Mike Holt when comes to SPD requirement. If you have a 320 continuous meter with double lugs feeding two separate mains how many SPD are required to be installed.
infinity Moderator Staff member Location New Jersey Occupation Journeyman Electrician Dec 31, 2024 #2 What code cycle?
N nivekbro Member Location Florida Occupation Electrician Dec 31, 2024 #3 2024 but down here in south Florida we just start to use 2020 code cycle