I'm working on a project where the utility company requires us to install a service disconnect per their specification (800A MCB switchboard with meter section) outside the facility. They have confirmed that they will not install SPD per our request at this switchboard. However, the main distribution panel (800A main and branch feeders) is located inside the building will have an SPD. My question, can we still obtain UL Master Label even though there is no SPD installed at the service disconnect outside the building? Thanks,
I'm working on a project where the utility company requires us to install a service disconnect per their specification (800A MCB switchboard with meter section) outside the facility. They have confirmed that they will not install SPD per our request at this switchboard. However, the main distribution panel (800A main and branch feeders) is located inside the building will have an SPD. My question, can we still obtain UL Master Label even though there is no SPD installed at the service disconnect outside the building? Thanks,