We are working on a center bus fed service switch which in return, feeds an 800 amp Pringle Switch on top and a 1200 amp Pringle switch on the bottom. We would like to take the load off the top switch, crimp splice 500 mcm's long enough to land them on the bottom switch (along with additional new cable to meet the new load).
Is there anything in the NEC that prohibits this sort of splicing in service switch enclosures?
:wink:
Is there anything in the NEC that prohibits this sort of splicing in service switch enclosures?