When a service disconnect located outside beside the meter on a residential project site already has Polaris connectors on the service conductors to feed a sub panel, can we perform a solar line side tap with IPCs. Looking to see if there are any restrictions in NEC in regard to max number of times IPC/polaris connectors/ the service entrance conductors can be spliced.