thank you ///////////////////////
:thumbsup::thumbsup:Don't just read part of that and think you can't splice in a panel!
I have never looked for it. I have looked at a pipe at 40% fill, which is the max allowed by the NEC and then looked at a panel where 75% fill is allowed and thought, "I've got nothing to worry about".WHERE can I find the cu in of a new panel with main breaker and breakers in it for box fill ?
I've read on here you can't overfill a panel........I have never looked for it. I have looked at a pipe at 40% fill, which is the max allowed by the NEC and then looked at a panel where 75% fill is allowed and thought, "I've got nothing to worry about".