We're doing a remodel and need to move the condo's sub panel, which will require splicing the EGC, from the main service, in a j-box. Does this splice have to be "irreversible" or is this only required for the main service ground? Also, can I bond the j-box with the sub-panels EGC or should I use a bonding bushing. Will either way work?
Thanks
Thanks