Im on a project where i added a generator panel and have to move over some circuits from a sub panel. The circuits I have to move over are in conduits that go underground and its not exactly easy to cut these conduits. Am I allowed to splice in the sub panel to extend the circuits to the generator panel. Everything is on the same service.