I think you'll be OK as long as the conduit is fully assembled first and thus still has metal-to-metal contact all the way through.Originally posted by mbk:
If the general contractor is using spray on fireproofing for the building steel and it covers the emt conduit, does this fireproofing need to be removed from the emt conduits?