solarken
NABCEP PVIP
- Location
- Hudson, OH, USA
- Occupation
- Solar Design and Installation Professional
Is anyone familiar with this PM5563 power meter and Smart Cell surge protector combination?  I have a customer where the CTs secondary leads look to have their polarity reversed and need to correct it. It was installed by a different electrical contractor, and I am configuring the meter and integrating it with their BAS.  I It is not clear to me if I can remove the meter or a cover on the unit while the SPD is installed into the panelboard bus, to get access to the CT lead terminals.  There are 800A:5A CT's installed in the i-line and the orientation of those on the service conductors looks correct, and I cannot get to them to flip the CT orientation either. Getting negative power readings on this thing and I think the CT lead polarity is reversed. Do I need to remove the whole unit?

	
		
			
		
		
	
				
			
 
				