Good day everybody.
I have a system which needs some modification. One of them is to run two generator in parallele. This system now has two gen (one=on, one=off) I need to add a third one, that implies incorporate the gen to the syncronizer system and this gen is going to work like the system spare. So for the units running 50% of the load. Do you think is necessary to check the stability of the system knowing that the gen are: 1250kW, 480V, 3p, 60hz. I am going to check the load flow, short circuit and starting of the motor for the system, but I do not know if stability is required. I appreciate your help in this matter.
Thanks
I have a system which needs some modification. One of them is to run two generator in parallele. This system now has two gen (one=on, one=off) I need to add a third one, that implies incorporate the gen to the syncronizer system and this gen is going to work like the system spare. So for the units running 50% of the load. Do you think is necessary to check the stability of the system knowing that the gen are: 1250kW, 480V, 3p, 60hz. I am going to check the load flow, short circuit and starting of the motor for the system, but I do not know if stability is required. I appreciate your help in this matter.
Thanks