Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
If there is a stair lighting riser(20+ flrs) that is being feed every 3-4 flrs from an em panel would you set sleeves if the slabs are poured in place or just run conduit without sleeves? Thanks.