Hello to All,
I have a stand-alone switchgear located in a mobile home park here in H.B. CA.
The existing sub-feeds come in thru bottom of enclosure, and spider web to various distribution points.
All are direct-burial THWN AL/conductors. A neutral in one of the runs failed, and left 5 units without power.
Had to enter gear underground into Utility-side of enclosure, due to many various problems.
The AHJ, Plan Check, and many other State Officials finally agreed, that this was the only application possible to restore power.
Utility has said, "hell no..take it out."
Do I have a leg to stand on, or is it worst-case-scenario in regards to Utility Inspector's athourity ?
I have a stand-alone switchgear located in a mobile home park here in H.B. CA.
The existing sub-feeds come in thru bottom of enclosure, and spider web to various distribution points.
All are direct-burial THWN AL/conductors. A neutral in one of the runs failed, and left 5 units without power.
Had to enter gear underground into Utility-side of enclosure, due to many various problems.
The AHJ, Plan Check, and many other State Officials finally agreed, that this was the only application possible to restore power.
Utility has said, "hell no..take it out."
Do I have a leg to stand on, or is it worst-case-scenario in regards to Utility Inspector's athourity ?