Is it a code violation or just a bad idea to install bonding jumpers from the frame of a machine, that is giving the workers static shocks, to the building steel, using that as the drain for the charge? I think we have a design problem, but the boss wants a quick fix. I have been told that this is a common problem in other mail processing centers that have this same type of equipment. The electrical feed to the equipment is 480@250amp/ 4wire, and the installer ran all types of grounding bonds, with a main #2 bare copper the entire length of the equipment, and this is tied to the frame and the ground bar where, I tied in the electrical grounding conductor.
bill