Stephen Scott
New member
- Location
- Novato, CA
I am inspecting a Northern California YMCA swimming pool that was built in 1971. Some of the metal drain grills and pool grab rails and climb out ladders are not bonded to an equipotential bonding grid. The 1969 NEC was in force at the time. Does anyone know what the bonding requirements were back then? Thanks to anyone who can help.
Stephen Scott
Stephen Scott
Last edited by a moderator: