timmermeier
Member
- Location
- alton il
- Occupation
- electrician
What year ( code cycle ) did the nec require 4 wires for sub panel ????????????????????????????????????????????????????????????????????????????????????????????????????????
For a detached structure 2008. Same structure been required forever.What year ( code cycle ) did the nec require 4 wires for sub panel ????????????????????????????????????????????????????????????????????????????????????????????????????????
For detached structures, 2008 I believe. For within the same structure, not sure but a long long time!What year ( code cycle ) did the nec require 4 wires for sub panel ????????????????????????????????????????????????????????????????????????????????????????????????????????
