Can any demand factors be applied for a sub-panel in the same building as the main panel? Can't seem to find anything in the code for calculating this. I have a garage addition that has a small sub-panel I'm upgrading and trying to decide if I can get by with #2AL ser on a 90 amp breaker vs #1 AL on a 100 amp breaker.
They are adding a 10 kw back-up heat, 2 ton AC, 4.5 kw water heater, and moving the well pump I believe is a 1/2 hp pump. Also has a sewer pump that pulls about 7 amps. Also one garage door opener. Area is around 960 square ft. That's over 100 amps if no demand factors and be used. If so, I'll go with a mlo 125 amp panel with #1CU or 2/0 AL.
They are adding a 10 kw back-up heat, 2 ton AC, 4.5 kw water heater, and moving the well pump I believe is a 1/2 hp pump. Also has a sewer pump that pulls about 7 amps. Also one garage door opener. Area is around 960 square ft. That's over 100 amps if no demand factors and be used. If so, I'll go with a mlo 125 amp panel with #1CU or 2/0 AL.