Ok, I read a recent post http://forums.mikeholt.com/showthread.php?t=130233&highlight=ground+wire+panel but I wanted to ask my question to clarify without bringing up the irrelevant parts of that post:
On a subpanel that is going to be connected to the main with emt, are we required to run the ground wire or will connectors wrench tight be sufficient for continuity? I am not talking about the neutral, but specifically the ground wire. I understand that neutral and ground wires are separate in subpanels with ground required to be carried back to main for termination.
Thanks in advance!
On a subpanel that is going to be connected to the main with emt, are we required to run the ground wire or will connectors wrench tight be sufficient for continuity? I am not talking about the neutral, but specifically the ground wire. I understand that neutral and ground wires are separate in subpanels with ground required to be carried back to main for termination.