james wuebker
Senior Member
- Location
- Iowa
House has a 200 amp main Sq. D QO panel in the basement. On the other end of the basement (60')is a 100 sub panel feed from the 200 amp main panel. The 4 wires are ran to it. Do I need to add a ground rod to this sub panel also and run a ground to the water main pipe where I already have my 200 amp main panel hook to? Remember that this is all in the basement of 1 house.
Thanks!
Jim
Thanks!
Jim