AES1005
Member
- Location
- Nitro West Virginia
Any Idea's on how to run a EGC for a subpanel to feed back to the main when the original installation only a three conductor cable was installed. All of the walls are up and painted. I realize the conductors are to be in the same raceway, just looking to see if anyone has run into this before.