Sub panel to residential detached garage

Status
Not open for further replies.
Sounds like you got it. Remember to separate the neutral and grounds at the panel. 2 ground rods and the grounding electrode conductor gets connected to the equipment grounds
 
That's how I do a pump house . Usually I backfeed a 60 amp breaker with a hold down kit installed for the disconnect. If they have a 5 hp pump, then I go to a 100 amp breaker, and larger wire.
 