sub panel

Status
Not open for further replies.

mickeyrench

Senior Member
Location
edison, n.j.
we installed a 200 a service single phase and a sub panel . i used 3 wire bx
to the sub . is this ok or do i need 4 wire bx? thanks for any help
yes, we used ac cable. thanks again
 
Last edited:
mickeyrench said:
we installed a 200 a service single phase and a sub panel . i used 3 wire bx
to the sub . is this ok or do i need 4 wire bx? thanks for any help
Article 320.108 appears to allow AC cable as an adequate path for equipment ground. I am assuming by BX you mean ac cable
 