Just wandering on a service i installed,useing a 200 amp mobile home mtr base disconect on the poco pole,from their to the house with 2/0-2/0
1/0 copper with #4 insulated ground 100 ft. to the house,the pnl there has a 200 amp main,this should make this a sub pnl,neutral and ground seperated.
so here is my question the inspector wants a ground rod at the meter and one at the sub pnl,
i know it will not hurt anything but why should it be required?
mdh
1/0 copper with #4 insulated ground 100 ft. to the house,the pnl there has a 200 amp main,this should make this a sub pnl,neutral and ground seperated.
so here is my question the inspector wants a ground rod at the meter and one at the sub pnl,
i know it will not hurt anything but why should it be required?
mdh