We recently designed a submersible pump installation, 700 HP pumps at 250+/- feet of water depth. We specified that the 500 MCM power conductor cables (approx. 1200') be continuous from MCC to motor. My question is, since no known similar application was available, if damage to the hypalon insulation were to occur, what is the best method of splicing?