Subpanel EGC

Status
Not open for further replies.

Sparky555

Senior Member
I run subpanels with 4-wire even when running EMT. I ran into a 3-wire (in EMT) subpanel and I can't find an NEC violation except that there isn't a bonded bushing with 10 ga copper minimum EGC (from Table 250-122). Is this correct?
 