My electrical subcontractor installed a subpanel and ran the feed and all the romex through the same 1 1/2" connector at the top of the box. This was inspected and passed. The home owner hired another electrician who said that it does not comply with code. I have checked with the inspector and other electricians and they all agree that it does not violate the code. Please advise.