Is a supply side bonding jumper for an RMC service raceway permitted to terminate to a main service panel equipment ground bar instead of the neutral bar? My understanding is that unless the main bonding jumper is a conductor or busbar, the same rule for GEC termination should apply to the SSBJ. Is this correct?