Yota Master
Member
- Location
- So Cal, Ramona CA
Help!!!!! Has anyone done a solar PV tie in before the meter due to the panel being to small to do a load side back feed. i have found it in the code but the local utility doesnt seem to be to helpful with the matter maybe due to not enogh experience with the mater.