MBCampbell
Member
I have a 1" run of RMC supported 20" from an LB; which then has a 6" nipple terminating into a consentric knock out in a meter enclosure.
I did not support the nipple.
A. Does then need to be supported?
B. Is it considered supported since the conduit run is supported within 3" even though there is a conduit body.
I did not support the nipple.
A. Does then need to be supported?
B. Is it considered supported since the conduit run is supported within 3" even though there is a conduit body.