Good day to all. I have been requested to provide pricing on the installation of a feeder in a hospital. The feeder is going to start of the 4th floor and run into the basement. There are electrical closets that are stacked on top of each other. We will be coring the floor and running two 3" conduits. The question I have is what do I need to do to support the conductors that are running vertical in the conduit?
Thank you