Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
When looking at drawings and you see devices( fire alarm in this instance) mounted on CMU block wall(new wall) how do you guys tell if the devices should be chopped in and conduit run within block or device and conduit surface mounted?