Surge Protection for Commercial Projects

Status
Not open for further replies.

Lbartowski

Member
Location
MN
Can SPD be installed at the main service to protect 150 dwelling units (condos)? I'm getting conflicting reports as to whether it is required in each unit panel, or just at the service. I assume at each panel is a better design, but 1 at the service is all that is required?
 

petersonra

Senior Member
Location
Northern illinois
Occupation
engineer
Can SPD be installed at the main service to protect 150 dwelling units (condos)? I'm getting conflicting reports as to whether it is required in each unit panel, or just at the service. I assume at each panel is a better design, but 1 at the service is all that is required?
What does the code actually say? If it say protection is required dwelling units, that is different than if it says protection is required for each dwelling unit.
 

don_resqcapt19

Moderator
Staff member
Location
Illinois
Occupation
retired electrician
Can SPD be installed at the main service to protect 150 dwelling units (condos)? I'm getting conflicting reports as to whether it is required in each unit panel, or just at the service. I assume at each panel is a better design, but 1 at the service is all that is required?
The current language permits one at the service disconnect. It is my understanding the the 2023 code will require one for each dwelling unit.
 