Good afternoon everyone,
I am working on a project that has alot of suspended strip fixtures that are numerous lengths. However there are 4' sections of these fixtures being fed with and EM circuit. Do you feel that this installation would comply with 700.9(B)(2) would it be acceptable to pull the em circuit and the normal through the fixture together? Or will i need to feed each section independantly so that the wiring is not ran together.
I am working on a project that has alot of suspended strip fixtures that are numerous lengths. However there are 4' sections of these fixtures being fed with and EM circuit. Do you feel that this installation would comply with 700.9(B)(2) would it be acceptable to pull the em circuit and the normal through the fixture together? Or will i need to feed each section independantly so that the wiring is not ran together.