hayastan1984
New member
I have tenant fit out project, which is going to be offices.
Failed my inspection today because the inspector told my foreman onsite that we can not use 1900 (4S) boxes with MC clumps for switches. He told him that we have to use a box without the clumps and just use regular 3/8 connectors for MC.
This is the 1st time that I heard about this and not sure if code requires it. Does any one know about this code?
Failed my inspection today because the inspector told my foreman onsite that we can not use 1900 (4S) boxes with MC clumps for switches. He told him that we have to use a box without the clumps and just use regular 3/8 connectors for MC.
This is the 1st time that I heard about this and not sure if code requires it. Does any one know about this code?