scenario is that the run to our electrical room is too far from poco transformer moving the trans would be too expensive so we are going to install the 800 amp switchgear midway between electrical room in new structure and the poco transformer want to make sure I bond correctly at the switchgear and the panels in the new structure will I need a ufer at both locations? can someone direct me to the proper code to study for wire & ufer size and for any other bonding requirements. TIA