Chev
Master Electrician @ Retired
- Location
- Mid-Michigan
- Occupation
- Retired Master Electrician, Formerly at Twin Lakes Electric and GMC
I'm trying to find if there are any prohibitions against this:
3 phase 480 volt feed to a fused switchbox, the same conduit also being used to route the secondaries? The feed is coming through a trough, going back out through the same trough.
Somewhere in the back of my head it is telling me that this is a no-no...any help out there![Confused :confused: :confused:](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
3 phase 480 volt feed to a fused switchbox, the same conduit also being used to route the secondaries? The feed is coming through a trough, going back out through the same trough.
Somewhere in the back of my head it is telling me that this is a no-no...any help out there