Hi
my inspector says that I am correct where I bonded 3/0 grounding electrode conductor to cold water pipe -main adjacent to t it's entry to builds but instead of continu of that wire I can jump with #6 wire to the ground rod installed some feet away from CWP bond
where is that enforced
in Code????
my inspector says that I am correct where I bonded 3/0 grounding electrode conductor to cold water pipe -main adjacent to t it's entry to builds but instead of continu of that wire I can jump with #6 wire to the ground rod installed some feet away from CWP bond
where is that enforced