is it acceptable to fix tap box (only bus bars inside) with WP enclosure 20 meter far from fire pumps controller prior feeding the following
one duty fire pump .
one standby fire pump and one jockey pump.
noting that we have two direct buried normal cables from substation (connected to transformer and generator )
one duty fire pump .
one standby fire pump and one jockey pump.
noting that we have two direct buried normal cables from substation (connected to transformer and generator )