bonding jumper
Senior Member
I have an incomming 3 phase service serving a meter followed by a 100 amp panel, 60a main and 8 branch breakers. I would like to tap from the top of the main to a disconnect switch that will serve a rectifier followed by the existing dc 60a fuse and then 5hp elevator motor. I feel that it is ok if the main breaker lugs are rated for the current and wire sizes being tapped at that point, but I just wanted to check myself here. As well as listen to any suggestions of feeding the rectifier another way. Thanks in advance.