NEC 2017 section 695.3(A)(1) you can have tap ahead of service disco and not within the same cabinet, enclosure, vertical swgr section. NEC 2017 section 701.12(E) also says you can do the same for legally require standby system with generator.
Can you do the tap ahead of service disco in separate vertical section from service disco but have two taps from that section one for fire pump and another for legally require standby system or both if them have to be in separate vertical section?
Can you do the tap ahead of service disco in separate vertical section from service disco but have two taps from that section one for fire pump and another for legally require standby system or both if them have to be in separate vertical section?