I work in an industrial plant that just does whatever when it comes to electrical. They don't really have to follow code because they fall under MSHA. Recently they had to install a temporary generator to feed an mcc bus for some pumps. The engineers (one who supposedly has a journeymans license) had the electricians install 4/0 cable from the generator to the mcc. Not parallel either. The generator has a 1000 amp breaker. So they put a 400 amp breaker at the mcc before the buss to protect the 4/0 cable. I think they said it was 30 to 60 feet run. This engineer said that the tap rule allowed this by code. I know what rule he is refering to about outside taps but in my opinion this isn't a tap. Plus the 400 amp breaker I don't believe is correct to protect the 4/0 cable either. Is this considered a tap? Any opinions on this? Thankyou