I was working with some electricians this morning and came across the following circuit. I have never seen this done before and thus would at least categorize it as " Non Customary Practice"; however, I question if it is acceptable by code.
I have a breaker, motor starter & OL relay located in the MCC with Start/Stop controls from a PLC. Located near the motor the T-Leads pass thru a box. Inside the box a 480/120V transformer is tapped into two of the motor leads. The transformer leads are fused appropriately and the 120V side of the transformer is used to power a bell and light.
Any thoughts?
I have a breaker, motor starter & OL relay located in the MCC with Start/Stop controls from a PLC. Located near the motor the T-Leads pass thru a box. Inside the box a 480/120V transformer is tapped into two of the motor leads. The transformer leads are fused appropriately and the 120V side of the transformer is used to power a bell and light.