I have a customer with a CH distribution box and a 2 gang meter pack hanging off one side. The gas company took up the availability real estate with their meter, so I'm unable to hang another meter pack. I'd like to bring a conduit into the distribution box, tap the bus and set a meter main.
Thoughts?
Thanks
David
Thoughts?
Thanks
David